Every feature in MaintenancePulse is purpose-built for NFPA 70B. No bloat. No features you'll never use. Just the tools you need to track, prove, and improve your electrical maintenance compliance.
Import your entire electrical inventory from a spreadsheet or enter equipment manually. Track manufacturer, model, serial number, voltage ratings, installation date, location, and photos for every asset.
| Name | Type | Status | Last Maintained |
|---|---|---|---|
| Main Switchgear | Switchgear | ✓ Current | Jan 2025 |
| MCC Panel A | MCC | ⚠ Due Soon | Mar 2024 |
| Transformer T1 | Transformer | ✓ Current | Nov 2024 |
| Panel LP-3 | Panelboard | ✗ Overdue | Aug 2023 |
Walk through our NFPA 70B-aligned assessment for each piece of equipment. Physical condition, environmental condition, and criticality — with plain-language descriptions at every step. Rate equipment in seconds, not hours.
A facility-level score (0–100) calculated from assessment completion, maintenance currency, and documentation status. Weighted by criticality — because your main switchgear matters more than a receptacle.
Maintenance intervals that automatically adjust based on equipment condition ratings. Condition 1? Every 5 years. Condition 3? Every year. The standard drives the schedule — you just follow it.
| Equipment | Next Due |
|---|---|
| Main Switchgear | Due Jan 2026 |
| MCC Panel A | Due in 14 days |
| Transformer T1 | Overdue 32 days |
| ATS Unit 1 | Due Mar 2026 |
Generate compliance scorecards (2–4 pages) for insurance submissions. Generate full EMPs (300–1,000+ pages) for consultants. Export filtered data as CSV or XLSX. Every report is designed to be read, not just filed.
Share your compliance scorecard with your insurance broker via a secure link — no login required. They see your score, your equipment summary, and your maintenance status. They can download the PDF.
Every change is logged: who, what, when, old value, new value. Schedule overrides require a reason. Nothing can be silently changed. This is your compliance backbone when an auditor asks “show me your history.”
| Feb 14 | K. Larsen | Maintenance logged: Main Switchgear — Pass |
| Feb 10 | K. Larsen | Condition updated: MCC Panel A — Cond 2 → Cond 1 |
| Jan 28 | System | Schedule updated: Transformer T1 — next due recalculated |
A focused mobile experience for maintenance workers. See what's due. Log what you did. Take a photo. Done. Designed for people who work with their hands — not people who sit at desks.
Take the free PulseCheck to see where your facility stands, or schedule a demo to see the full platform.